Plant Construction - The integrative core of the INTEGRAL-Group

Below you will find a selection of our references to give you an overview of ​​our capabilities.

BoP and piping systems Mellach

Customer:

Siemens AG Austria
Vienna (A)

Scope of work:

Engineering, suppy and assembly of complete BoP (I) and piping systems (ND, MD, HD), cooling water system and district heating extraction (II) for gas-combined cycle power plant (2x400 MW) in Mellach (A).

Technical Data I:

Weight:

app. 1,300 t

 

Material:

X10CrMoVNb9-1/ 10CrMo9-10 13CrMo4-5/ 16Mo3/ P265GH P235GH/ P195GH/ 1.4541

 

Dimension:

DN6-DN1500, PN16-PN320

Technical Data II:

Weight:

Piping system: app. 560 t
GRP piping system: app. 1,100 t

 

Material:

P235GH/ L360NB/ 1.4571

 

Dimension:

PE 100: DN15-DN900 to PN40
GRP: DN150-DN2200 to PN10

Execution period:

2009-2011

 

Assembly turnkey evaporation plant Lenzing

Customer:

Lenzing AG / Attisholz Infra AG 
Lenzing (A) / Riedholz (CH)

Scope of work:

Disassembly, relocation and reassembly of complete turnkey evaporation plant including compressor.

Technical Data:

Weight:

380 t equipment
40 t piping system
110 t steel construction

 

Material:

V4A

 

Dimension:

DN15-DN1250 to PN25

Execution period:

2010

 

Complete piping raw material plant Pernhofen

Customer:

Jungbunzlauer Austria AG
Wulzeshofen (A)

Scope of work:

Complete piping in stainless steel including primary- and secondary steel as well as piping of cooling tower, fermentation chambers and boiler house for the raw material plant Pernhofen (A). 

Technical data: Weight: 575 t piping systems
125 t steel construction V2A
  Material: 1.4571, 1.4301, P235GH
 

Dimension:

DN10-800 to PN16

Execution period:

2008-2009

 

Piping and equipment assembly HDS-plant Ploiesti

Customer:

Petrom S.A.
Bukarest (RO)
Fluor S.V. (NL)

Scope of work:

Mechanical work, piping and equipment assembly including commissioning for the modernization project called „Gas Oil Hydrotreating“ HDS-plant in the refinery Petrobazi, Ploiesti (RO).

Technical data:

Weight:

550 t piping systems
400 t equipment

 

Material:

LTCS1.5, LTCS1.5+PWHT/SR, LTCS3.0, LTCS3.0+PWHT/SR, 1.25CR3.0+PWHT/SR, 304SS0, 316SS1.5 Mod

 

Dimension:

DN20-DN400, ANSI150-900

Execution period:

2007-2008

 

Complete assembly of blast furnace gas-fired Boiler Linz

Customer:

AE&E Austrian Energy & Environment
Linz (A)

Scope of work:

Complete assembly of blast furnace gas-fired boiler Block 07, steel construction work, equipment, pressure parts, complete piping and support as well as installation of SCR-plant. VA-Block 07: 160 MWel.

Technical data:

Weight:

5,200 t

 

Material:

16Mo3, 13CrMo4-5, 10CrMo9-10, P265GH, X10CrMoVNb9-1, 15NICuMoNb5-6-4

 

Dimension:

DN10-800

 

Main steam:

460 t/h / 145 bar / 545 degrees

 

Media:

blast furnace gas, coke gas, natural gas, fuel oil light

Execution period:

2007-2008

 

District cooling plant & pipe Spittelau

Customer:

Fernwärme Wien Gesellschaft m.b.H.
Wien (A)

Scope of work:

Engineering, supply, assembly and commissioning, testing, training and documentation of the cooling plant, cooling converter station, pressure maintenance, stream cooling water system and  district cooling pipe (DN400).

 Technical data: Two absorption refrigerators with 5 MW each as well as one turbo  compressor refrigerator with 7 MW inclusive pumps, fittings and pipes.
  Total cool
water max:


1,700 m³/h, 12 degrees / 4 degrees

  Total hot
water max:


300 m³/h, 150 degrees / 60 degrees

Execution period:

2008-2010