Engineering - The shared goal from the idea to commissioning

Below you will find a selection of our references to give you an overview of ​​our capabilities.

Dust removal, desulphurisation & dentrification Dangjin

Customer:

Hyundai WIA-Corporation
Dangjin (South Korea)

Scope of work:

Dimensioning, engineering, commissioning and supervision of two CSCR® lines for desulphurization and denitrification as well as of an upstream dust removal.

Technology:

CSCR®-desulphurization and denitrification technology (Carbon Selective Catalytic Reduction), activated carbon adsorber and fabric filter.

Technical data:

Flue gas volume: 

1,800,000 Nm³/h (flue gas volume / stack)

 

Flue gas temperature: 

140 degrees

Execution period:

2011-2013

 

Flue gas denitrification plant Strudtrupværket

Customer:

Burmeister & Wain Energy A/S
Strudtrupværket (DK)

Scope of work:

Engineering of flue gas denitrification plant (1 line) with high dust application for the power plant Strudtrupværket (DK).

Technology:

SCR (Selective Catalytic Reduction).

Technical data: Flue gas volume: 1,090,800 Nm³/h

Execution period:

2004-2008

 

SCR-plant Taean

Customer:

S&T Corporation
Taean (South Korea)

Scope of work:

Basic Engineering, commissioning, supervision, training und license for SCR-plant for the power plant Taean, Unit 1-6 (South Korea).

Technology: 

SCR (Selective Catalytic Reduction).

Technical data:

6 x 500 MW coal-fired boiler for unit 1-6

Unit 1-4:

  Flue gas volume: app. 1,500,000 Nm³/h
  Flue gas temperature:
347 degrees
  Unit 5-6:  
  Flue gas volume: app. 1,500,000 Nm³/h
  Flue gas temperature:
388 degrees

Execution period:

2005 - 2006

 

Town gas production plant Dalian

Customer:

Dalian Gas Company
Dalian (CN)

Scope of work:

Process design and complete planning for expansion of production unit for town gas for the city Dalian for furhter three lines.

Technology:

CCR (Cyclic Catalytic Reforming).

Technical data: Production capacity: 750,000 Nm³ / day

Execution period:

2006-2007

 

Flue gas and waste water treatment Linz

Customer:

Linz Strom GmbH
Linz (A)

Skope of work:

Plant planning, engineering, supply and assembly of the complete flue gas and waste water treatment (1 line) for the combined heat and power plant Linz (A).

Technology:

Wet limestone scrubbing and SCR (Selective Catalytic Reduction).

Technical data:

Power: 72.6 MW thermal
  Capacity: 200,000 Jato residual material and sewage sludge
  Flue gas volume max: 190,000 Nm³/h

Execution period:

2009-2011

 

SO2-wet limestone scrubbing Vienna-Simmering

Customer:

Fernwärme Wien Gesellschaft m.b.H.
Vienna (A)

Scope of work:

Dimensioning, calculation and planning of SO2-wet limestone scrubbing DRO1 and DRO2 for the hazardous waste incineration plant Vienna-Simmering (A).

Technology:

Flue gas wet limestone scrubbing, two-stage.

Technical data:

Flue gas volume max: 80.000 Nm³/h

Execution period:

2011-2013

 

Waste incineration plant Konin

Customer:

Miejski Zakład Gospodarki Odpadami Komunalnymi Sp. z o.o. (MZGOK)
Konin (PL)

Scope of work:

Engineering, delivery, assembly and commissioning, testing, training and documentation of grate-based combustion with boiler and combustion system using SNCR, flue gas cleaning system and heat recovery steam generator (HRSG).

Technology:

Grate-combustion MARTIN® reverse-action grate, semi-dry flue gas cleaning system with activated carbon injection, fabric filter.

Technical data:

Waste throughput:

94,000 t

 

Combustion capacity:

28.3 MWth

 

Main steam:

32.4 t/h / 40 bar / 400 degrees

  Flue gas volume:

55,000 Nm³/h

Execution period:

2013-2015