Energy Management & Environmental Engineering-Green heart of INTEGRAL

Below you will find a selection of our references to give you an overview of ​​our capabilities.

Flue gas cleaning plant Linz

Customer:

Linz Strom GmbH
Linz (A)

Scope of work:

Engineering, supply, assembly and commissioning, testing, training and documentation of complete of flue gas cleaning plant (desulphurization, denitrification, heavy metal removal, dust removal, dioxin and furan removal).

Technology:

Bag house filter, two-stage wet limestone scrubbing and SCR-catalyst.

Technical data:

Capacity: 

190,000 Nm³/h (flue gas volume / stack)

 

Flue gas temperature:

180 degrees

Execution period:

2009-2012

 

Flue gas cleaning system Pfaffenau

Customer:

WKU - Wiener Kommunal-Umweltschutzprojektgesellschaft m.b.H.
Vienna (A)

Scope of work:

Engineering, supply, assembly and commissioning, testing, training and documentation of the flue gas cleaning system – two lines.

Technology:

Two-stage wet limestone scrubbing including sewage treatment plant, activated carbon and SCR (Selective Catalytic Reduction).

Technical data:

Flue gas volume: 88,000 Nm³/h (flue gas volume / stack)
  Flue gas temperature:
160 degrees

Execution period:

2005-2009  

Flue gas cleaning plant Suhl

Customer:

Martin GmbH für Umwelt- und Energietechnik
Munich (GER)

Scope of work:

Engineering, delivery, assembly and commissioning, testing, training and documentation of complete flue gas cleaning plant (desulphurisation and dust removal) for the residual waste removal plant in Suhl / Southwest Thüringen (GER).

Technology:

Semi-dry desulphurisation, spray absorber, bag house filter.

Technical data:  

Waste througput:

160,000 t/a

 

Flue gas volume:

134,500 Nm³/h (flue gas volume / stack)

 

Flue gas
temperature max:


180 degrees

Execution period:

2003-2008

 

Water-steam-cycle Frankfurt

Customer:

EBARA Corporation
Tokyo (JPN)

Scope of work:

Design and layout, basic and detail engineering, delivery, assembly and commissioning, testing, training and documentation of water-steam cycle, turbine piping and cooling water system for the combustion plant at Industrial Estate in Frankfurt am Main (GER).

Technical data:

Main steam: 330 t/h
  Temperature: 460 degrees
  Pressure: 68 bar
  Electrical power: 86 MW
  Total weight: Piping system: app.  1,000 t
Equipment: app. 450 t
  Material: St37 / P235GH / P265GH / 16Mo3 / 10CrMo9-10 / 13CrMo4-5 / P91 / 1.4301 / 1.4571 / PP / PE / GFK

Execution period:

2007-2010

 

Fluidized reactor Vienna

Customer:

Fernwärme Wien Gesellschaft m.b.H.
Vienna (A)

Scope of work:

General contractor (engineering, supply, assembly and commissioning,  testing, training and documentation) for construction of the fluidized-bed  incinerator and flue gas cleaning plant, water-steam cycle with district  heating extraction, construction works, electrical, electrical, control and  instrumentation as well as automation.

Technology:

Fluidized-bed combustion EBARA-ROWiTEC®, waste heat boiler, electrical precipitator, two-stage wet limestone scrubbing, activated carbon adsorber and SCR (Selective Catalytic Reduction).

Technical data:

Waste throughput:

100,000 t/a municipal waste and sewage sludge

 

Combustion capacity:

38 MWth

 

Main steam:

47 t/h / 53 bar / 350 degrees

  Flue gas volume:

80,000 Nm³/h

Execution period:

2001-2004