Building Services - Consolidated Expertise and years of experience

Below you will find a selection of our references to give you an overview of ​​our capabilities.

BILLA Meat cutting plant Oeynhausen

Customer:

REWE International Lager- und Transport GmbH
Wiener Neudorf (A)

Scope of work:

Planning, supply, assembly and commissioning of building services for the following areas: heating, ventilation, smoke and heat venting system, sanitary equipment, cooling, control and Instrumentation as well as coating for the BILLA meat cutting plant in Oeynhausen (A).

Technical data:

Gas-fired condensing
boiler system:

2 x 550 kW
  Material: steel pipes, stainless steel pipes, plastic combosite pipes, galvanized steel panels

Execution period:

2008-2009  

Cooling installation Palace of Justice Vienna

Customer:

VA TECH Elin EBG GmbH & Co
Vienna (A)

Scope of work:

Extension of cooling installation and cool water exchange with refrigerant condenser in split construction (353,8 kW) for the Palace of Justice in Vienna (A).

Technical data:

Climatic cold water:

6 / 12 degrees for 10 appliances

 

Buffer tank:

3,000 l

 

Material:

piping with seamless pipes

Execution period:

2003-2006

 

Refurbishment of rented flats Vienna

Customer:

Stadt Wien - Wiener Wohnen
Vienna (A)

Scope of work:

Refurbishment of rented flats (gas, water and heating) as well as emergency and repair service in complete apartment buildings and multi-story buildings.

Execution period:

since 2008

 

Power station St. Martins Therme & Lodge Frauenkirchen

Customer:

Best Energy GmbH
Eisenstadt (A)

Scope of work:

Installation of power station as well as planning, supply, assembly and commissioning of building services for the following areas: heating, ventilation, cooling, control and instrumentation.

Technical data:

Gas-fired
boiler:


2 x 3 MW

 

Heat pumps:

2 x 662 kW

 

Hydraulic bonding:

CHP plant
(Combinated Heat and Power)

 

Material:

steel pipes, galvanized steel panels

Execution period:

2009-2010

 

Power station Krankenhaus Barmherzige Brüder Eisenstadt

Customer:

BEGAS Energie AG
Eisenstadt (A)

Scope of work:

Installation of power station as well as planning, supply, assembly and commissioning of building services for the following areas: heating, ventilation, control and instrumentation, coating.

Technical data:

Gas-fired
boiler:

2 x 3 MW
  Hydraulic bonding: CHP plant
(Combinated Heat and Power)
  Material: steel pipes, galvanized steel panels

Execution period:

2011-2012  

REWE Group Distribution center West

Customer:

REWE International Lager- und Transport GmbH
Wiener Neudorf (A)

Scope of work:

Planning, supply, assembly and commissioning of building services for the following areas: heating, ventilation, sanitary equipment, chillers and cold storage cells, compressed air plant, hydrant and gas pipe, control & Instrumentation as well as coating.

Technical data:

Gas-fired condensing
boiler system:

1 x 920 kW, 1 x 650 kW
  Ventilation: app. 25,000 m³/h
  Material: steel pipes, stainless steel pipes, plastic combosite pipes,  galvanized steel panels

Execution period:

2012-2013